      Schneider Electric MV Electrical distribution in Cruise ships

      Success Story: Marine Installation optimised by 30%
      Installation optimised by 30%

       

      I. CUSTOMER ENVIRONMENT / PROJECT CONTEXT

       

      Customer profile:

      STX Europe is one of the world's largest builders of cruise ships and has either built - or has in the order booked - the 15 largest cruise ships in the world. STX Europe is also one of Europe's top three ferry builders.

       

      Customer objective and constraints:

      The main objective of the shipyard for the construction of a Cruise ship is to guarantee a ship that is completely safe for the passenger.

      This means that STX expects his subcontractor to propose a reliable solution (equipment).

      A loop configuration allows the customer to manage his electrical network and thus avoid energy losses.

       

      The shipyard's main constraint due to the ship construction method and deadline is to choose a supplier who will comply with the manufacturing deadline.

       

      II. SOLUTION IMPLEMENTATION

       

      Implementation methodology (main phases):

      Schneider Electric was identified by STX as a good partner with:

      Electrical Distribution Network Reliability Solution:
                 1. Understand and identify risks
                 2. Optimised architecture, compare solutions, highlight weak points
                 3. Design redundancies and back-up configurations

       

      Duration:

      1 year

       

      Solution overview (services, products, systems, architectures...):

      The following equipment was chosen:

           - Main Switchboard with McSet: 11kV - 60Hz - busbar: 2500A - Isc = 50kA

           - Loop equipment with RM6: 11kV - 60Hz - busbar: 630A - Isc = 16kA

           - Reactor to limit the Isc level from 50kA to 16kA from BCV

           - Local Control panel design by Schneider Electric Marine Activity

       

      The main switchboard consisted of 2 x 17 cubicles (AD2) + one control panel delivered in one block. That means that Schneider Electric delivered a complete switchboard 13m long and weighing 22 tonnes installed all at the same time onboard the ship.

       

      III. RESULTS / ACHIEVEMENT

       

      Customer benefits:

      - Schneider Electric offer (Product and equipment) lets you install a loop MV distribution thanks to the Ring Main unit and optimise the installation by 30% (cables, transformers, LV distribution).

      - This solution also guarantees the reliability (continuity of service) of the MV distribution network.

      - A configurable electrical network

      - Type approved equipment (DNV certification)

       
       
       
       
       

      Solution breakdown

      Main products & systems:
      • MV Compact switchboard (Ring Main Unit) up to 24 kV: RM6
      • Metal-enclosed Switchgear from 7.2 to 17.5 kV: MCset 1,2,3