Oil & Gas
              Oil & Gas logo

              Success Story: Oil & Gas

              Sinopec (China)

              Pipeline Boosting station control system

              Success Story: Oil & Gas Powerful control: 10K instructions per 1ms
              Powerful control: 10K instructions per 1ms

               

              I. CUSTOMER ENVIRONMENT / PROJECT CONTEXT

               

              Customer profile:

              • The longest Pipeline in China. From Xinjiang, West China to Shanghai, East China, 4000Km main line.
              • 120x108Nm3/a natural gas transferred
              • Pipeline diameter: 1016mm
              • Pressure: 10MPa
              • 44 Station Control System (SCS) with Hot-standby CPUs
              • 146 Remote Terminal Unit (RTU) with single CPU
              • Redundant control centre in Beijing and Shanghai
              • Western Development Strategy
               

              Customer objective and constraints:

              • Ensure safety
              • Control local equipment
              • Control the whole system via a control centre
              • Giant process I/O: temperature, pressure, flow meter, turbine compressor, fire alarm, cathodic protection
              • Control logic and arithmetic
               

              II. SOLUTION IMPLEMENTATION

               

              Implementation methodology (main phases):

              • Powerful function selection
              • Redundant architecture
              • Flexible architecture
              • Opening communication protocol
               

              Duration:

              • 2 years: 2003 to 2004
               

              Solution overview (services, products, systems, architectures...):

              Solution overview (services, products, systems, architectures...):
               

              III. RESULTS / ACHIEVEMENT

               

              Customer benefits:

              Results:
              • Since initial run in 2004, 4 years of successful operation.
              • Ensures the pipeline provides users with stable natural gas.

              System Function:
              • Powerful functions to meet device control and remote control requirements.
              • Stable quality: ensures stable operation in high and low temperature at Xinjing and humid conditions in South China.
              • Redundant architecture meets the requirement of 24/7 system operation to ensure pipeline safety.
               

              Schneider Electric differentiating values VS competitors:

              • Automatic data transfer from primary to Standby without any specific configuration.
              • All services in an "all-in-one" network.
               
               
               
               
               

              Solution breakdown

              Main services:
              • Engineering services: Services
              Main products & systems:
              • Quantum HSB
              • Quantum SIL2
              • Remote I/O
              • HMI
              • Operation station software Vijeo-Citect