              I. CUSTOMER ENVIRONMENT / PROJECT CONTEXT

               

              Customer profile:

              • Anadarko Algeria Corporation, a subsidiary of Anadarko U.S., in association with Sonatrach, has been at the origin of the biggest recent oil discoveries worldwide.
              • As one of the oil reserves of the Ghadames Basin in the East Algerian Sahara desert, Hassi-Berkine - Sud is estimated to contain more than 1 billion barrels of oil. Sonatrach/Anadarko awarded Brown & Root - Condor, a joint venture between Sonatrach and Halliburton, the Engineering, Procurement and Construction contract for this first development stage which produces 60,000 barrels/day.
               

              Customer objective and constraints:

              To place a turnkey order with a reliable manafacturer, able to carry out the project in a short time.

               

              II. SOLUTION IMPLEMENTATION

               

              Implementation methodology (main phases):

              • Letter of award: October 1996
              • Order technically released: February 1997
              • Delivery date: August 1997
              • Commissioning: January-March 1998
              • First Oil: April 1998
               

              Duration:

              From October 1996 to March 1998.

               

              Solution overview (services, products, systems, architectures...):

               
              • Turnkey project management
              • Engineering and design
              • MV and LV equipement
              • On site installation and commissioning supervision
              Solution overview (services, products, systems, architectures...):
               

              III. RESULTS / ACHIEVEMENT

               

              Customer benefits:

              • Turnkey project management
              • Fast track project
              • Maximum flexibility in late modification requests
               
               
               
               
               

              Solution breakdown


              Equipment:
              • One 7.5 MVA oil filled transformer 11 kV/5.5 kV,
              • four 4 MVA oil filled transformers 11 kV/5.5 kV,
              • two large prefabricated powerhouses fully equipped with HVAC system, fire protection system, lighting and auxiliaries,
              • one 11 kV and two 5.5 kV switchboards/ MCCs (Fluair range) with Sepam protection and control units,
              • three 400 V switchboards (Masterbloc) and eleven 400 V MCCs (TDI),
              • six 400 V busducts (3150 A),
              • AC and DC UPS systems,
              • three auto transformer starters,
              • one generator synchronising panel,
              • LV distribution boards,