Select a country
Select your country/region in the menu or by clicking on the world map *
Country Selector Alternate Image
Energy Efficiency

            Simple load control/shedding solution

             
             

            Value proposition


            Main drivers

            • Avoidance of peak demand pentalies.
            • Maintain power to critical process.

            Solution in brief
             
            • This simple solution use current control to automatically monitor and shed a load if a pre-set limit is exceeded.

            Value proposition
            • Avoid paying peak demand penalties , by installing devices which can control consumption and automatically shut down non-critical loads.
            • Shed less critical loads and keep the critical process running.

            Differentiation factors

            • Use current control to automatically monitor. It is very easy to install and just by adding a time delay can be programmed before the load is re-connected.
            • By adding a GTC building and management system control safety can be enhanced  in an installation. The load can be turned on again only after being checked by competent personnel.
             

            Architecture

            Architecture
             
             
             
             
             

            Solution breakdown

            • Main Products & Systems
              _ Protection circuit-breaker: C60 and DPN
              _ Current control: RCI
              _ Time delay: ACTt
              _ Current transformer: Ti
              _ Load shedding contactor: CDsc